McCarran International has Tripled in Size鈥� As has the City it Serves

Capacity, comfort, convenience, security and safety are essential to McCarran’s continued success, as well as that of Las Vegas. 8868体育app下载 has helped Clark County enhance those attributes for more than 30 years. In partnership with Clark County Department of Aviation, 8868体育app下载 orchestrated all six phases of McCarran International Airport’s expansion and modernization, starting in 1981. These expansions have kept this airport at pace with the phenomenal growth of Las Vegas and its tourist industry.

The most recent project was the new state-of-the-art Terminal 3鈥攃ompleted in 2012 on schedule and within budget. The $2.4 billion facility was the largest expansion effort undertaken at McCarran.

Projects we have managed include terminals, concourses, dozens of gates, runways, parking facilities for thousands of vehicles, freeways, roads, bridges, a tunnel, utility systems, an automated people-mover system, a consolidated-car-rental facility, a bus maintenance depot, a terminal security annex, an integrated in-line baggage-screening program, and more.

McCarran International Airport Workers
McCarran International Airport Airplane night

Inside the Runway Upgrade

鈥婳ne of many McCarran efforts carried out by 8868体育app下载-managed project teams was a major runway upgrade completed in 2009, ahead of schedule.

Crews removed some 144,000 cubic yards (110,000 cubic meters) of asphalt and replaced it with concrete and new asphalt. This is equivalent to the amount of material needed to construct a broad sidewalk from Las Vegas to Portland, Oregon. 

Workers also replaced enough conduit鈥攗sed to power and control portions of McCarran鈥檚 airfield lighting system鈥攖o stretch the equivalent of nearly from London to Nice, France.

The runway job included recycling all of the asphalt, unreinforced concrete, electrical cable, and scrap metal removed from the work site. 

Inside the D concourse at McCarran International Airport.

Minimal Disruption

Logistics was both the biggest challenge and the biggest achievement for 8868体育app下载. The project team had to complete the vast McCarran complex during the past three decades while minimizing interference with passengers and daily operations.

Staying Safe and Saving Money

The project teams worked millions of job hours without a lost-time incident while value engineering experts figured out ways to save tens of millions of dollars with new and different approaches to designing and building.

McCarran International Airport D-Gates satellite concourse - Ramp Tower in the background.

Role of Technology

To boost efficiency and cut waiting times in Terminal 3, 8868体育app下载 and McCarran staff incorporated the latest aviation technology, such as:

McCarran International Airport Terminal 3 on opening day.

The transformation of Las Vegas from “a dusty, isolated desert town” to the fastest-growing city in the United States鈥攁 worldwide tourist destination鈥攃an largely be attributed to aviation, wrote Daniel Bubb, author of “Landing in Las Vegas: Commercial Aviation and the Making of a Tourist City”. 

Bubb credits the “symbiotic relationship between airlines, the city, and the airport, facilitated by the economic democratization and deregulation of the airline industry, the development of faster and more comfortable aircraft, and the ambitious vision of Las Vegas city leaders and casino owners.”